Ana sayfa
Home | Türkçe
BANDIRMA HEPP

PROJECT LOCATION: BALIKESİR/TURKEY
CLIENT: EBERJİSA ENERGY PRODUCTION CO.INC.
CONTRACTOR: AKON GROUP
PURPOSE: ENERGY

PROJECT CHARACTERISTICS
3.28 MW Installed Capacity
26 m Gross Head
14.90 m3/s Project Discharge
In Operation Since 2014

SCOPE OF SERVICES: (2013-2014)
Geological Site Investigation
Final Design Works
Preparation of Technical Specifications
Consultancy for EM Equipments
Detail Design Works
Periodical Site Visits & Reporting During Construction
Support and Attendance for Construction Progress Meetings
Consultancy for Site Applications

 
 
Project utilizes cooling water of 936 MW combined cycle natural gas power plant. The Power House has been installed on the fill inside sea by the help of secant piles. Piles were implemented at foundation of the head pond due to geological conditions. Corrosion resistant design of hydro-mechanical and electromechanical equipment since sea water is used as cooling water.


 

 
  • 24_Bandırma HEPP
 
Erges Consulting Inc.
Harbiye Mah. Tavuskuşu Cad. No: 25/9 06460 Çankaya/Ankara, TURKEY • T: +90 312 479 26 06 • F: +90 312 479 26 08 • e-mail: info@erges.com.tr

Web Design: AdaNET