YAZILI I-II-III WEIRs AND HEPP

PROJECT LOCATION: MERSİN -ANAMUR-İÇEL /  SUGÖZÜ RIVER
CLIENT: ELİF ENERGY GEN.CO. LTD.
PURPOSE: ENERGY

PROJECT CHARACTERISTICS:
Yazılı-I
3 m High Masonry Weir Body
800 m Long HDPE Pipe System

Yazılı-II
5.5 m High Concrete Gravity Weir Body
2030 m Long Penstock Pipe System

Yazılı-III
3 m High Masonry Weir Body
970 m Long Penstock Pipe System
220 m Gross Head
3.00 m3/s Project Discharge
6.62 MW Installed Capacity
1 Horizontal Axis
Pelton Turbine, 1 Vertical Axis Pelton Turbine
28.39 GWh Annual Energy Production
1.7 km Access Road
In Operation Since 2014

SCOPE OF SERVICES: (2010-2014)
Revised Feasibility Studies
Topographical Site Survey
Site Specific Seismic Risk Assessment
Final Design Works
Preparation of Technical Specifications
Detail Design Works
Periodical Site Visits & Reporting During Construction
Support and Attendance for Construction Progress Meetings
Consultancy for Site Applications

Masonry weir body was implemented for reducing costs and due to construction material shortage. 400m of the power tunnel was constructed by pipe jacking.

 

 
  • YAZILI REGÜLATÖRÜ VE HES
  • YAZILI REGÜLATÖRÜ VE HES
  • 16_Yazılı HEPP
 
Erges Consulting Inc.
Harbiye Mah. Tavuskuşu Cad. No: 25/9 06460 Çankaya/Ankara, TURKEY • T: +90 312 479 26 06 • F: +90 312 479 26 08 • e-mail: info@erges.com.tr

Web Design: AdaNET