PROJECT LOCATION: MERSİN -ANAMUR-İÇEL / SUGÖZÜ RIVER CLIENT: ELİF ENERGY GEN.CO. LTD. PURPOSE: ENERGY PROJECT CHARACTERISTICS: Yazılı-I 3 m High Masonry Weir Body 800 m Long HDPE Pipe System Yazılı-II 5.5 m High Concrete Gravity Weir Body 2030 m Long Penstock Pipe System Yazılı-III 3 m High Masonry Weir Body 970 m Long Penstock Pipe System 220 m Gross Head 3.00 m3/s Project Discharge 6.62 MW Installed Capacity 1 Horizontal Axis Pelton Turbine, 1 Vertical Axis Pelton Turbine 28.39 GWh Annual Energy Production 1.7 km Access Road In Operation Since 2014 SCOPE OF SERVICES: (2010-2014) Revised Feasibility Studies Topographical Site Survey Site Specific Seismic Risk Assessment Final Design Works Preparation of Technical Specifications Detail Design Works Periodical Site Visits & Reporting During Construction Support and Attendance for Construction Progress Meetings Consultancy for Site Applications Masonry weir body was implemented for reducing costs and due to construction material shortage. 400m of the power tunnel was constructed by pipe jacking.
|