PROJECT LOCATION: DÜZCE/ HAMAMSUYU RIVER CLIENT: TİMSE ELECTRIC GENERATION LTD. CO. PURPOSE: ENERGY PROJECT CHARACTERISTICS: 4.4 m High Concrete Gravity Weir Body 3904.50 m Long Conveyance Channel 330.25 m Gross Head 4.543 MW Installed Capacity 11.028 GWh Annual Energy Production In Operation Since: 2016 SCOPE OF SERVICES: (2011-2016) Feasibility Studies Topographical Site Survey Geological Site Investigations Site Specific Seismic Risk Assessment Final Design Works Preparation of Technical Specifications Consultancy for EM Equipment Selection Detail Design Works Periodical Site Visits & Reporting During Construction Support and Attendance for Construction Progress Meetings Consultancy for Site Applications Steel superstructure was designed for the powerhouse for reducing the construction time.
|