PROJECT LOCATION: HATAY/DÖRTYOL CLIENT: KOÇOĞLU GROUP/COŞKUN ELECTRIC PRODUCTION PURPOSE: ENERGY PROJECT CHARACTERISTICS: 11.35 m High Concrete Gravity Weir Body Uncontrolled Overflow Spillway with 160.76 m3/s Capacity 4400 m Long CTP Water Conveyance Line 166 m Gross Head 7.50 m3/s Project Discharge 9.835 MW Installed Capacity 2 Horizontal Axis Francis Turbines 35.672 GWh Annual Energy Production In Operation Since 2013 SCOPE OF SERVICES: (2012-2013) Planning and Feasibility Studies Final Design Works Preparation of Technical Specifications Detail Design Works Periodical Site Visits & Reporting During Construction
|