PROJECT LOCATION: RİZE ÇAYELİ/UZUNDERE CLIENT: KOÇOĞLU HOLDİNG (KAÇKAR ENERGY) PURPOSE: ENERGY PROJECT CHARACTERISTICS: Total Installed Capacity: 7.0 MW Total Energy Production 36.2 GWh Gross Head : 65.0 m Conveyance Tunnel Length : 850.0 m SERVICES PROVIDED: Feasibility Studies Final Design Studies Detailed Design STATUS: Ongoing Design Works
|