PROJECT LOCATION: ALADAĞ- ADANA/DOĞANÇAY AUTHORITY: 6h REGIONAL DIRECTORATE OF STATE HYDRAULIC WORKS /ADANA CONTRACTOR: ULU ENERGY ELECTRIC PRODUCTION PURPOSE: ENERGY PROJECT CHARACTERISTICS: Total Installed Capacity: 11.98 MW Total Energy Production: 3.290 GWh Gross Head: 60.0m Flow Capacity: 23.0m3/s SERVICES PROVIDED: Planning and Feasibility Studies TIME DURATION: 2008-2013
|