PROJECT LOCATION: TORUL-GÜMÜŞHANE/DEMİRKAPI RIVER CLIENT: NA-TA ENERGY PRODUCTİON TRADE.LTD.ŞTİ. PURPOSE: ENERGY PROJECT CHARACTERISTICS: Total Installed Capacity: 8.28MW Total Energy Production: 21.104 GWh Gross Head: 148.50 Conveyance Tunnel Type (CTP pipe): 3084.0 m SERVICES PROVIDED: Feasibility Studies Final Design Studies Detailed Design STATUS: Ongoing Design Works
|