|
PROJECT LOCATION: SİVAS GEMEREK / GÖKSU RIVER CLIENT: GÜRÜZ ELECTRIC PRODUCTION LIMITED CO. PURPOSE: ENERGY PROJECT CHARACTERISTICS: Headpond with 1100 m3 Capacity 2180 m Long Conveyance Channel 35.16 m Gross Head 5.50 m3/s Project Discharge 1.54 MW Installed Capacity 2 Horizontal Axis Francis Turbines 8.283 GWh/year Annual Energy Production 0.5 km Access Road In Operation Since 2011 SCOPE OF SERVICES: (2009-2011) Topographical Site Survey Geological Site Investigations Site Specific Seismic Risk Assessment Final Design Works Preparation of Technical Specifications Consultancy for EM Equipment Selection Detail Design Works Periodical Site Visits & Reporting During Construction Support and Attendance for Construction Progress Meetings Consultancy for Site Applications Project utilizes the water from existing Göksu Weir.
|