PROJECT LOCATION: ANTALYA AKSEKİ / DEGIRMEN RIVER CLIENT: ERENLER ENERGY PRODUCTION AND TRADE CO. INC. PURPOSE: ENERGY PROJECT CHARACTERISTICS: 7 m High Concrete Gravity Weir Body Uncontrolled Overflow Spillway with 113.41 m3/s Capacity 1077.97 m Long Conveyance Channel 125.75 m Gross Head 6.80 m3/s Project Discharge 6.84 MW Installed Capacity 2 Horizontal Axis Francis Turbines 19.81GWh Annual Energy Production In Operation Since 2013 Spillway Type: Uncontrolled Frontal Overflow Concrete Dam Conveyance Channel Type: 1078 m Length, 3.60 m Diameter, Modified Horseshoe Rotage Type/Dimensions: Head Pond/ 8.0 x 53.75 m Penstock: 338.40 m Length, 1.4 m Diameter SCOPE OF SERVICES: (2011-2013) Site Specific Seismic Risk Assessment Final Design Revision Detail Design Works Periodical Site Visits & Reporting During Construction
|