PROJECT LOCATION: TRABZON ARSİN/ SUGÖZÜ RIVER CLIENT: PAMUK ENERGY GEN. CO. LTD. PURPOSE: ENERGY PROJECT CHARACTERISTICS: 11.1 m High Concrete Gravity Weir Body Uncontrolled Overflow Spillway with 119 m3/s Capacity 4378.04 m Long Power Tunnel 116 m Gross Head 8 m3/s Project Discharge 9.55 MW Installed Capacity 2 Horizontal Axis Francis Turbines 29.09 GWh Annual Energy Production 0.3 km Access Road In Operation Since 2015 SCOPE OF SERVICES:(2012-2015) Feasibility Study Site Specific Seismic Risk Assessment Final Design Works Preparation of Technical Specifications Preparation of Tender Documents Consultancy for Tender Phases Consultancy for EM Equipment Selection Detail Design Works Periodical Site Visits & Reporting During Construction Support and Attendance for Construction Progress Meetings Consultancy for Site Applications The necessity of a surge tank was eliminated by optimization of tunnel diameter and length.
|