YANBOLU WEIR AND HEPP

PROJECT LOCATION: TRABZON ARSİN/  SUGÖZÜ RIVER
CLIENT: PAMUK ENERGY GEN. CO. LTD.
PURPOSE: ENERGY

PROJECT CHARACTERISTICS:
11.1 m High Concrete Gravity Weir Body
Uncontrolled Overflow Spillway with 119 m3/s Capacity
4378.04 m Long Power Tunnel
116 m Gross Head
8 m3/s Project Discharge
9.55 MW Installed Capacity
2 Horizontal Axis Francis Turbines
29.09 GWh Annual Energy Production
0.3 km Access Road
In Operation Since 2015

SCOPE OF SERVICES:(2012-2015)
Feasibility Study
Site Specific Seismic Risk Assessment
Final Design Works
Preparation of Technical Specifications
Preparation of Tender Documents
Consultancy for Tender Phases
Consultancy for EM Equipment Selection
Detail Design Works
Periodical Site Visits & Reporting During Construction
Support and Attendance for Construction Progress Meetings
Consultancy for Site Applications

 

The necessity of a surge tank was eliminated by optimization of tunnel diameter and length.

 