ÇAKMAK CASCADE HEPPs

PROJECT LOCATION: KAHRAMANMARAŞ /TURNASUYU RIVER
CLIENT: ATASER ENERGY GENERATION LTD. CO.  
PURPOSE: ENERGY

PROJECT CHARACTERISTICS:
2 Weirs, 3 Power Plants
Total 2100 m Long Conveyance Channel
4 km Access Road
In Operation Since 2014

Çakmak I HEPP
12.5 m High Concrete Gravity Weir Body
18.75 MW Installed Capacity
3 Vertical Axis Pelton Turbines
377 m Gross Head
30.71 GWh Annual Energy Production

Çakmak II HEPP
8 m High Concrete Gravity Tyrolean Weir Body
27.23 MW Installed Capacity
3 Vertical Axis Pelton Turbines , 1 Horizontal Axis Pelton Turbine
136.34 m Gross Head
30.71 GWh Annual Energy Production

Söğütlü HEPP
18.32 MW Installed Capacity
3 Vertical Axis Pelton Turbines
370.75 m Gross Head
30.31 GWh Annual Energy Production

SCOPE OF SERVICES: (2012-2014)
Geological Site Investigation
Site Specific Seismic Risk Assessment
Final Design Works
Preparation of Technical Specifications
Consultancy for EM Equipment Selection
Detail Design Works
Periodical Site Visits & Reporting During Construction
Consultancy for Site Applications

 

 

 

 