PROJECT LOCATION: KAHRAMANMARAŞ /TURNASUYU RIVER CLIENT: ATASER ENERGY GENERATION LTD. CO. PURPOSE: ENERGY PROJECT CHARACTERISTICS: 2 Weirs, 3 Power Plants Total 2100 m Long Conveyance Channel 4 km Access Road In Operation Since 2014 Çakmak I HEPP 12.5 m High Concrete Gravity Weir Body 18.75 MW Installed Capacity 3 Vertical Axis Pelton Turbines 377 m Gross Head 30.71 GWh Annual Energy Production Çakmak II HEPP 8 m High Concrete Gravity Tyrolean Weir Body 27.23 MW Installed Capacity 3 Vertical Axis Pelton Turbines , 1 Horizontal Axis Pelton Turbine 136.34 m Gross Head 30.71 GWh Annual Energy Production Söğütlü HEPP 18.32 MW Installed Capacity 3 Vertical Axis Pelton Turbines 370.75 m Gross Head 30.31 GWh Annual Energy Production SCOPE OF SERVICES: (2012-2014) Geological Site Investigation Site Specific Seismic Risk Assessment Final Design Works Preparation of Technical Specifications Consultancy for EM Equipment Selection Detail Design Works Periodical Site Visits & Reporting During Construction Consultancy for Site Applications
|