Ana sayfa
Home | Türkçe
KARAMENDERES HEPP

PROJECT LOCATION: BAYRAMİÇ-ÇANAKKALE/KARAMENDERES
CLIENT: AKARET ENERGY GEN. CO. LTD.
PURPOSE: ENERGY

PROJECT CHARACTERISTICS:
345 m Long Conveyance Tunnel
42.7 m Gross Head
6.80 m3/s Project Discharge
2.60 MW Installed Capacity
2 Horizontal Axis Francis Turbines
7.57 GWh Annual Energy Production
In Operation Since: 2017

SCOPE OF SERVICES: (2010-2017)
Feasibility Studies
Topographical Site Survey
Geological Site Investigations
Site Specific Seismic Risk Assessment
Final Design Works
Preparation of Technical Specifications Preparation of Tender Documents
Consultancy for Tender Phases
Consultancy for EM Equipment Selection
Detail Design Works Periodical Site Visits & Reporting During Construction
Support and Attendance for Construction
Progress Meetings

 
Project utilizes the water from the bottom outlet of 48.6 m high Bayramiç Dam which is under operation since 1997. Older bottom outlet was renewed for diverting the water.
 
 
  • KARAMENDERES HES
  • KARAMENDERES HES
  • KARAMENDERES HES
  • 25_Karamenderes HEPP
 
Erges Consulting Inc.
Harbiye Mah. Tavuskuşu Cad. No: 25/9 06460 Çankaya/Ankara, TURKEY • T: +90 312 479 26 06 • F: +90 312 479 26 08 • e-mail: info@erges.com.tr

Web Design: AdaNET