PROJECT LOCATION: BAYRAMİÇ-ÇANAKKALE/KARAMENDERES CLIENT: AKARET ENERGY GEN. CO. LTD. PURPOSE: ENERGY PROJECT CHARACTERISTICS: 345 m Long Conveyance Tunnel 42.7 m Gross Head 6.80 m3/s Project Discharge 2.60 MW Installed Capacity 2 Horizontal Axis Francis Turbines 7.57 GWh Annual Energy Production In Operation Since: 2017 SCOPE OF SERVICES: (2010-2017) Feasibility Studies Topographical Site Survey Geological Site Investigations Site Specific Seismic Risk Assessment Final Design Works Preparation of Technical Specifications Preparation of Tender Documents Consultancy for Tender Phases Consultancy for EM Equipment Selection Detail Design Works Periodical Site Visits & Reporting During Construction Support and Attendance for Construction Progress Meetings Project utilizes the water from the bottom outlet of 48.6 m high Bayramiç Dam which is under operation since 1997. Older bottom outlet was renewed for diverting the water.
|