AKINCI I-II WEIRS AND HEPP

PROJECT LOCATION: KAYSERİ - YAHYALI / KIZILIRMAK
CLIENT: ESSENTİUM ENERGY GROUP
PURPOSE: ENERGY

PROJECT CHARACTERISTICS:
5.9 m High Concrete Gravity Weir Body
Run of River Plant
12.32 MW Installed Capacity
2 Horizontal Axis Bulb Turbines
11.1 m3/s Project Discharge
6.42 m Gross Head
24.52 GWh Annual Energy Production
Estimated Operation Date: 2016

Storage Type: Hydropower Plant with Reservoir, Tailwater Power Plant

Spillway Type: Rubber Dam, Uncontrolled Frontal Overflow

SCOPE OF SERVICES: (2011-2014)

Detail Design Works Periodical Site Visits & Reporting During Construction

Instead of gates, rubber dams were implemented in the project to reduce costs.

 
  • AKINCI-1 & AKINCI-2 REGÜLATÖRÜ VE HES
  • AKINCI-1 & AKINCI-2 REGÜLATÖRÜ VE HES
  • AKINCI-1 & AKINCI-2 REGÜLATÖRÜ VE HES
 
Erges Consulting Inc.
Harbiye Mah. Tavuskuşu Cad. No: 25/9 06460 Çankaya/Ankara, TURKEY • T: +90 312 479 26 06 • F: +90 312 479 26 08 • e-mail: info@erges.com.tr

Web Design: AdaNET