PROJECT LOCATION: ANTALYA / KARGIRIVER CLIENT: DİNAMİK HYDROELECTRIC POWER STATION VENTURE ELECTRIC GENERATION LTD.CO. PURPOSE: ENERGY PROJECT CHARACTERISTICS: 4.4 m High Concrete Gravity Weir Body Uncontrolled Overflow Spillway with 618 m3/s Capacity 960.53 m Long Power Tunnel 114.79 m Gross Head 6.00 m3/s Project Discharge 5.63 MW Installed Capacity 2 Horizontal Axis Francis Turbines 12.18 GWh Annual Energy Production In Operation Since: 2016 SCOPE OF SERRVICES:(2014-2016) Topographical Site Survey Geological Site Investigation Site Specific Seismic Risk Assessment Final Design Works Consultancy for EM Equipment Selection Preparation of Technical Specifications Detail Design Works Periodical Site Visits & Reporting During Construction Support and Attendance for Construction Progress Meetings Consultancy for Site Applications Project includes an underground settling basin and an underground powerhouse.
|