TELEME DIVERSION WEIR AND HEPP

PROJECT LOCATION: NURHAK-KAHRAMANMARAŞ/ GÖKSU RIVER
CLIENT: TAYEN ELEKTRİK ÜRETİM LTD.ŞTİ.
PURPOSE: ENERGY

PROJECT CHARACTERISTICS:
Total Installed Capacity:  1.57 MW
Total Energy Production: 6.338 GWh
Gross Head: 88.30 m
Conveyance System (PE Pipe) : 3204.00 m

SERVICES PROVIDED:
Planning and Feasibility Studies
Final Design Studies
Detailed Design

STATUS:
Under Operation (Since 2012)

 