|
PROJECT LOCATION: NURHAK-KAHRAMANMARAŞ/ GÖKSU RIVER CLIENT: TAYEN ELEKTRİK ÜRETİM LTD.ŞTİ. PURPOSE: ENERGY PROJECT CHARACTERISTICS: Total Installed Capacity: 1.57 MW Total Energy Production: 6.338 GWh Gross Head: 88.30 m Conveyance System (PE Pipe) : 3204.00 m SERVICES PROVIDED: Planning and Feasibility Studies Final Design Studies Detailed Design STATUS: Under Operation (Since 2012)
|