PROJECT LOCATION: KARS - KAĞIZMAN / ARAS RIVER CLIENT: RENAISSANCE CONS. CO. INC. PURPOSE: ENERGY PROJECT CHARACTERISTICS: 8.61 m High Concrete Gravity Weir Body Radial Gated Overflow Spillway with 1478 m3/s Capacity 4110 m Long Water Conveyance Line 28.31 m Gross Head 58.60 m3/s Project Discharge 22.10 MW Installed Capacity 2 Vertical Axis Kaplan Turbines 79.76 GWh Annual Energy Production In Operation Since 2013
Spillway Type: Controlled Frontal Overflow Concrete Conveyance Channel: Trapezoidal Channel Storage Type: Head Pond Penstock: 2 lines, 50 m Length, 3.75 m Diameter SCOPE OF SERVICES: (2010-2012) Final Design Works Preparation of Technical Specifications Detail Design Works Periodical Site Visits & Reporting During Construction Piles were implemented at headpond and powerhouse areas.
|