PROJECT LOCATION: AMASYA/ YEŞİLIRMAK CLIENT: RENAISSANCE CONS. CO. INC. PURPOSE: ENERGY PROJECT CHARACTERISTICS: 13.70 m High Concrete Gravity Weir Body Gated Overflow Spillway with 885.80 m3/s Capacity 9.1 m Gross Head 115 m3/s Project Discharge 9.40 MW Installed Capacity 2 Vertical Axis Kaplan Turbines 31.069 GWh Annual Energy Production In Operation Since 2012 SCOPE OF SERVICES: (2012-2013) Final Design Works Preparation of Technical Specifications Detail Design Works Periodical Site Visits & Reporting During Construction Jet grout was implemented at weir body foundation to provide impermeability.
|