|
32.70 m High RCC Weir Body Uncontrolled Overflow Stepped Spillway with 502.58 m3/s Capacity 2736.5 m Long Power Tunnel 15.2 m3/s Project Discharge 172.72 m Gross Head 23.05 MW Installed Capacity 2 Vertical Axis Francis Turbines 58.287 GWh Annual Energy Production In Operation Since 2013 STORAGE TYPE Hydropower Plant with Reservoir / 202000 m³ PENSTOCK PIPELINE 453.08 m Length, 2.25 m Diameter
|