Ana sayfa
Home | Türkçe
TURNASUYU CASCADE HEPPs /BÜBEN WEIR

32.70 m High RCC Weir Body
Uncontrolled Overflow Stepped Spillway with 502.58 m3/s Capacity
2736.5 m Long Power Tunnel
15.2 m3/s Project Discharge
172.72 m Gross Head
23.05 MW Installed Capacity
2 Vertical Axis Francis Turbines
58.287 GWh Annual Energy Production
In Operation Since 2013

STORAGE TYPE
Hydropower Plant with Reservoir / 202000 m³

PENSTOCK PIPELINE
453.08 m Length, 2.25 m Diameter

 
  • TURNASUYU ENERJİ GRUBU PROJESİ
  • TURNASUYU ENERJİ GRUBU PROJESİ
  • TURNASUYU ENERJİ GRUBU PROJESİ
  • TURNASUYU ENERJİ GRUBU PROJESİ
  • TURNASUYU ENERJİ GRUBU PROJESİ
 
Erges Consulting Inc.
Harbiye Mah. Tavuskuşu Cad. No: 25/9 06460 Çankaya/Ankara, TURKEY • T: +90 312 479 26 06 • F: +90 312 479 26 08 • e-mail: info@erges.com.tr

Web Design: AdaNET