37.50 m High RCC Weir Body
Uncontrolled Overflow Stepped Spillway with
255.45 m3/s Capacity
4774.6 m Long Power Tunnel
13.4 m3/s Project Discharge
186 m Gross Head
22 MW Installed Capacity
2 Vertical Axis Francis Turbines
51.495 GWh Annual Energy Production
1.5 km Access Road
In Operation Since 2013
STORAGE TYPE
HEPP with Reservoir (capacity 370000 m³)
PENSTOCK
326.90m Length, 2.15 m Diameter
32.70 m High RCC Weir Body
Uncontrolled Overflow Stepped Spillway with 502.58 m3/s Capacity
2736.5 m Long Power Tunnel
15.2 m3/s Project Discharge
172.72 m Gross Head
23.05 MW Installed Capacity
2 Vertical Axis Francis Turbines
58.287 GWh Annual Energy Production
In Operation Since 2013
STORAGE TYPE
Hydropower Plant with Reservoir / 202000 m³
PENSTOCK PIPELINE
453.08 m Length, 2.25 m Diameter