37.50 m High RCC Weir Body
Uncontrolled Overflow Stepped Spillway with
255.45 m3/s Capacity
4774.6 m Long Power Tunnel
13.4 m3/s Project Discharge
186 m Gross Head
22 MW Installed Capacity
2 Vertical Axis Francis Turbines
51.495 GWh Annual Energy Production
1.5 km Access Road
In Operation Since 2013

STORAGE TYPE
HEPP with Reservoir (capacity 370000 m³)

PENSTOCK
326.90m Length, 2.15 m Diameter

 

 