PROJECT LOCATION: AFYONKARAHİSAR SANDIKLI / KOMİ RIVER CLIENT: 18th REGIONAL DIRECTORATE OF STATE HYDRAULIC WORKS/ ISPARTA PURPOSE: IRRIGATION (1438 ha) PROJECT CHARACTERISTICS: Body Type: Clay Core Earth Fill Height from Foundation /Crest Length: 57.50m / 385.63 m Diversion Weir Type:Uncontrolled Frontal Overflow / Crest Width: 20.0 m Diversion Tunnel: 193.96 m Length, 3.60 m Diameter, Horseshoe Intake Structure: 11.70 m Height, Tower Type SERVICES PROVIDED: Final Design Studies PROJECT DURATION: 2012-2014
|