|
PROJECT LOCATION: NİĞDE YEŞİLBURÇ / KAYNARDERE AUTHORITY: 4th REGIONAL DIRECTORATE OF STATE HYDRAULIC WORKS/ KONYA CONTRACTOR: MEHMET ALPTEKİN – TURGAN CONSTRUCTION LIMITED CO. PARTNERSHIP PURPOSE: IRRIGATION (1020 ha) PROJECT CHARACTERISTICS: Dam Type: Clay Core Rock Fill Height from Foundation: 40.50 m Spillway Type: Uncontrolled Frontal Overflow Diversion Conduit: 222.40 m Length SERVICES PROVIDED: Final Design Revision Studies Detailed Design PROJECT DURATION: 2011-2013
|