FEKE II DAM AND HEPP

PROJECT LOCATION: ADANA/GÖKSU RIVER
PURPOSE: ENERGY
CLIENT: AKKUR ENERGY ELECTRIC PRODUCTION CO. INC.
CONTRACTOR: NATA CONSTRUCTION INDUSTRY TRADE LIMITED CO.

PROJECT CHARACTERISTICS:
Dam Type: Roller Compacted Concrete Dam (RCC)
Height from Foundation /Crest Length: 70 m / 252.7 m
Spillway Type: Frontal type, Radial Gates (3 pieces 11.30x12.50m)
Energy Dissipater Type: Flip Bucket

POWER PLANT
Gross Head: 63m
Project Discharge: 127.50 m3/s
Total Installed Capacity: 70.0 MW
Turbine Type/ Number of units: Francis-Vertical Axis /2 units
Annual Energy Production: 223.41 GWh

SERVICES PROVIDED
Final Design Studies
Detailed Design

PROJECT DURATION: 2008-2011

   DAMS
 
  • FEKE II BARAJI VE HES
  • FEKE II BARAJI VE HES
  • FEKE II BARAJI VE HES
  • FEKE II BARAJI VE HES
  • FEKE II BARAJI VE HES
  • FEKE II BARAJI VE HES
  • FEKE II BARAJI VE HES
  • FEKE II BARAJI VE HES
  • FEKE II BARAJI VE HES
  • FEKE II BARAJI VE HES
 