Ana sayfa
Home | Türkçe
BOYALI HEPP

PROJECT LOCATION: DOĞANŞAR-SİVAS/KIZILIRMAK
CLIENT: YEŞİLBAŞ ELEKTRİK ÜRETİM LTD.ŞTİ
PURPOSE: ENERJİ

PROJECT CHARACTERISTICS:
Total Installed Capacity: 6.61 MW
Total Energy Production: 4.123 GWh
Gross Head: 77.50 m
Conveyance System (Penstock) : 10.00 m3/s

SERVICES PROVIDED:
Planning and Feasibility Studies

 
 
Erges Consulting Inc.
Harbiye Mah. Tavuskuşu Cad. No: 25/9 06460 Çankaya/Ankara, TURKEY • T: +90 312 479 26 06 • F: +90 312 479 26 08 • e-mail: info@erges.com.tr

Web Design: AdaNET