PROJECT LOCATION: TORUL-GÜMÜŞHANE/GÜMÜŞTUĞ RIVER CLIENT: NATA ENERJİ ELEK. ÜRETİM TİC.LTD.ŞTİ PURPOSE: ENERGY PROJECT CHARACTERISTICS: Total Installed Capacity: 5.80 MW Total Energy Production: 16.69 GWh Gross Head: 243.50 m Conveyance Channel Lenght : 4 050 m SERVICES PROVIDED: Planning and Feasibility Studies STATUS: Ongoing EİA
|