UZUNGÖL I WEIR AND HEPP

PROJECT LOCATION: TRABZON/ÇAYKARA
CLIENT: BORDO-MAVİ ENERGY GEN. CO. LTD. (TRABZONSPOR FOOTBALL CLUB)
PURPOSE: ENERGY

PROJECT CHARACTERISTICS:
6 m High Concrete Gravity Weir Body
Uncontrolled Overflow Spillway with 73.20 m3/s Capacity
4134 m Long Power Tunnel
271 m Gross Head
12 m3/s Project Discharge
29.076 MW Installed Capacity
3 Vertical Axis Pelton Turbines
80.479 GWh Annual Energy Production
Estimated Operation Date: 2018

Spillway Type: Uncontrolled Frontal Overflow Concrete
Conveyance System: 4134 m Length, 3.50 m Diameter, Modified Horseshoe  
Vertical Shaft:   4.30 m Diameter, 163 m Depth


Surge Tank-Head Pond:
Diameter: 21.50m / Height: 18.0 m
Penstock: 550 m Length, 4.60 m Diameter

SCOPE OF SERVICES: (2015-On Hold)
Topographical Site Survey
Site Specific Seismic Risk Assessment
Final Design Works
Preparation of Technical Specifications
Preparation of Tender Documents
Consultancy for Tender Phases
Consultancy for EM Equipment Selection
Detail Design Works
Periodical Site Visits & Reporting During Construction
Consultancy for Site Applications

Project includes friction pile system and jet grout at weir body foundation for foundation improvement and impermeability, since weir body is located on 24 m deep alluvium.

 
  • UZUNGÖL-1 REGÜLATÖRÜ VE HES
  • 02_Uzungöl HEPP
 