PROJECT LOCATION: BANDIRMA-BALIKESİR
PURPOSE: ENERGY
CLIENT: ENERJİSA ENERGY PRODUCTION CO. INC.
CONTRACTOR: AKON GROUP

SERVICES PROVIDED
Final Design Studies
Detailed Design

PROJECT CHARACTERISTICS:
Scope of Project : HEPP utilizing cooling water of combined cycle natural gas power plant
Gross Head: 26 m
Total Installed Capacit : 3.28 MW

 