PROJECT LOCATION: BURSA/GEMLİK AUTHORITY: 1st REGIONAL DIRECTORATE OF STATE HYDRAULIC WORKS/ BURSA CONTRACTOR: STY CONSTRUCTION PURPOSE: WATER SUPPLY PROJECT CHARACTERISTICS: Dam Type: Concrete Face Rockfill Height from Foundation/Crest Length: 81.0 m / 385.0 m Spillway Type: Side Channel Overflow Diversion Tunnel: 287.5m Length, 3.00m Diameter, Horseshoe Intake Structure: Leaning on the Side Slope SERVICES PROVIDED: Detailed Design PROJECT DURATION: 2013-Ongoing
|