PROJECT LOCATION: VENTİS-KAYSERİ-YAHYALI SOLAR POWER PLANT,
KAYSERİ/TURKEY
CONTRACTOR: Citus Power
PROJECT CHARACTERISTICS:
VENTİS-KAYSERİ-YAHYALI Solar Power plant
installed capacity of 9x1 MW
Drainage System Design of Solar Power Plant (0,15 km2 )
SERVICES PROVIDED:
Detailed Design
Preparation of;
Estimation of Design Surface Runoff Rate
Frequency Analysis of Regional Rainfall Data
Hydraulic Design of Drainage Pipe Systems
Hydraulic Design of Channel Systems
PROJECT DURATION: 2019